top of page

Kinguélé Aval Hydropower Project

OTEC ENGINEERING has signed a consultancy service contract with SINOHYDRO on the December 10, 2021, for the Engineering design, Procurement and Construction (EPC) of the Kinguélé Aval Hydropower project in Gabon. This is the second hydropower project in Gabon for OTEC Engineering.


Comments


Commenting has been turned off.
bottom of page