top of page

Aboisso ComoƩ HPP

  • Writer: Otec
    Otec
  • Mar 28, 2024
  • 1 min read

Updated: Dec 16, 2024

OTEC Engineering, partnering with Tractebel Engineering (France and CĆ“te d’Ivoire), has visited SM Plus (EKDS Nouvelle) in Abidjan for the launch of the Feasibility Studies of Aboisso-ComoĆ© HPP project. The trip also included a site visit to assess the potential dam axes and plant location.


The Aboisso-ComoƩ project, developed by SM Plus, is located in the east of Abidjan on the KomoƩ river has a potential of 90 MW installation. OTEC Engineering partnering with Tractebel Engineering will perform the feasibility studies of the project.



bottom of page