Project of Securing Electricity Power Supply in Libreville, Owendo and Ntoum

Capacity

-

Location

Gabon

Completion date

2010

Work scope:

  • Construction of BASE SEEG  90/20 kV GIS substation at LIBREVILLE;

  • Construction of NTOUM 2 225/90 kV distribution substation at NTOUM;

  • Construction of ANGONDJE  90/20 kV substation at the future Stadium;

  • Extension of the AMBOWE 90kV substation;

  • Extension of the OWENDO SEEG 90KV substation;

  • Extension of the SEEG BELLEVUE station;

  • Adaptation of the BISSEGUE 90KV substation to the control center and extension of the substation;

  • A 90 kV overhead line along the railway from the new OWENDO thermal power plant - OWENDO SEEG - NTOUM 2, for an approximate distance of 38 km;

  • A 90 kV overhead line between NTOUM 2 and ANGONDJE substations over a distance of approximately 50 km;

  • A 90 kV overhead line between the AMBOWE and ANGONDJE substations over a distance of 15 km;

  • A 90 kV underground transmission line from the new OWENDO thermal power plant - BISSEGUE - AMBOWE over a distance of 23 km;

  • A 90 kV underground transmission line between the BASE SEEG and SEEG BELLEVUE substations over a distance of approximately 4 km.


Services:

  • Feasibility studies

  • Technical Assistance for contract negotiations.