Douala Drinking Water Supply Project - Phase I Dibamba River
Capacity
300 000 m3/d
Location
Cameroon
Completion date
2017
Main scope:
An intake station with the capacity of 110 000 m3 per day;
A water pipeline ,of 26 km from the river border to the Massoumbou Water treatment plant;
Demolition of the existing Massoumbou water treatment plant;
A water treatment plant with a capacity of 100,000 m3 per day on the existing Massoumbou plant site;
Water pipeline of approximately 11 km connecting the water treatment plant to the watertowers;
The access roads to the water intake and the treatment plant, as well as the roads maintenance for the water conveyance pipeline.
Services:
Feasibility Studies.