Wujin South Phase 2 Waste Water Drainage Network and Treatment Plant and Advanced processing plant
Capacity
100 000 tons/day
Location
China
Completion date
2014
Work scope:
1 Waste Water Drainage Network extension 40km precast concrete pipes with diameter from 300 to 2000mm
3 pumping stations 1 60 000m3/day treatment plant with Carrousel 2004 process
1 Advanced deep processing plant 100 000 m3/day
Services:
Feasibility Report
Basic Design
Technical specifications of equipments
Construction Design
As-built drawings