Hydroelectric Project of Gribo Popoli - 112MW

Capacity

112 MW

Location

Ivory Coast

Completion date

2018

Work scope:

  • An earth filled dam with a length of approximately 4000 m;

  • A 6 passes gated spillway incorporated in the dam on the left bank

  • A powerhouse integrated into the body of the dam on the right bank, equipped with three Bulb units with a total installed capacity of 112 MW

  • A tailrace channel of approximately 700m in length;

  • A 225kV switchyard;

  • Two single circuit overhead lines of 225kV for the cut-off connection to the 225 kV line Soubré-San Pedro, approximately 2x8km;

  • A permanent access road on the right bank of approximately 15 km, and a deviation from the road on the left bank of 8 km.


Services:

  • Feasibility studies;

  • Definition of the geological and geotechnical investigations, and geological and geotechnical study;

  • Assistance to the meeting between the Contractor and the Employer

  • Review and Advice to the Basic and Construction Design